In September 2022, BE Anadarko II acquired the operated assets in the Ben Hill, Sutters Mill and Make Believe fields located in the Western Anadarko Basin within Roberts, Ochiltree, Hemphill, Lipscomb and Hansford counties, Texas. These geographically concentrated fields include [70] mature, producing wells in the prolific X and Y formations plus a significant inventory of drilling locations and return-to-production wells.
The acquired assets produce approximately 7,400 net mcf per day, of which 60% is dry gas production. BE Anadarko II holds 13,100 net acres of which 100% is help-by-production.